Second Pro Novum Bulletin in 2016 have been published in the December number of 'Energetyka'.

It contains the following articles:

  1. Jerzy Trzeszczyński - Life extension of 100 MW – 360 MW power units accompanied by Diagnostics 4.0
  2. Jerzy Trzeszczyński, Paweł Gawron, Wojciech Murzynowski - Guidelines for life extension of modernized power units 100 MW – 360 MW
  3. Kamil Staszałek, Radosław Stanek - Monitoring of operating conditions of boilers of 200 MW power units to assess the impact
  4. of cycle load on the technical conditionof selected components and construction nodes
  5. Sławomir Rajca, Ewald Grzesiczek - Damages caused by flexible operation and long standstills of turbine sets
  6. Rafał Szyja, Bartosz Borcz - Lifetime extension of pipelines over calculated time on the basis of UDT and Pro Novum

We invite you to read the Bulletin here (only Polish version).